Project : HVAC Equipment

All existing heating, ventilation, and air conditioning (HVAC) equipment was thoroughly inspected and repaired/replaced to maintain maximum system efficiency. A new Energy Management System (EMS) was also installed to allow computer based monitoring, control, and optimization of the existing equipment. This project was completed in February 2010. Total project cost was $57,281.56. Exisiting split system cooling used to condition the Data Room was replaced in June 2013. Tola construction cost was $6,180.00